Solicitation Number | Title | Posted Date | Closing Date | Last Updated Date | |
2024-006-RFQ | Fixed Base Operator Consulting Services | 12/19/2023 12:50 PM AZ Time | 04/08/2024 02:00 PM AZ Time | 04/08/2024 03:30 AM AZ Time | Solicitation Summary
The Phoenix-Mesa Gateway Airport Authority (PMGAA) is seeking a firm to evaluate all aspects of the Phoenix-Mesa Gateway Airport’s Fixed Base Operator (FBO) operations to include financial, operational, capital, untapped opportunity(ies), risk/liability and provide a summarized recommendation on whether to continue to operate the FBO in-house or pursue privatization. |
2024-016-RFQ | CMAR for Runway 12R-30L Reconstruction | 01/18/2024 01:40 PM AZ Time | 02/13/2024 02:00 PM AZ Time | 03/14/2024 02:15 PM AZ Time | Solicitation Summary
Phoenix-Mesa Gateway Airport is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction and complete construction services for the reconstruction of Runway 12R/30L. |
2024-015-RFP | Common Use Passenger Processing System | 03/27/2024 10:15 AM AZ Time | 05/23/2024 02:00 PM AZ Time | 05/08/2024 05:00 PM AZ Time | Solicitation Summary
The Phoenix Mesa-Gateway Airport Authority (PMGAA) is seeking proposals to replace its current suite of products including Resource Management System (RMS), Common Use Terminal Equipment (CUTE), Content Management System (CMS)/Flight Information Display System (FIDS) and potentially its Lease Management, Billing, and Risk Management solution. PMGAA intends to have feature-rich, flexible, and supportable systems to meet airline, passenger, and airport needs, both today and in the foreseeable future for PMGAA. |
2024-017-IFB | 1,500 Gallon Refuel / Defuel Bowser | 04/02/2024 10:40 AM AZ Time | 04/30/2024 02:00 PM AZ Time | 05/01/2024 09:09 AM AZ Time | Solicitation Summary
Phoenix Mesa Gateway Airport Authority invites Offerors to submit a bid for one (1) new 1,500 gallon refuel / defuel bowser. |
2024-014-IFB | Runway 12C-30C Asphalt Mill & Replacement, Lighting & Signage Upgrade | 04/11/2024 01:14 PM AZ Time | 05/06/2024 02:00 PM AZ Time | 05/07/2024 04:24 PM AZ Time | Solicitation Summary
The intent of the project is to complete various improvements to Runway 12C-30C and portions of
adjacent Taxiways G, K, and P. A portion of Runway 12C-30C between existing PCCP sections (as shown on the plans), and portions of Taxiway K (north and south of Runway 12C-30C up to existing PCC pavement tie-in locations) will have the existing AC pavement milled to a depth (as shown on the plans) and replaced. Runway 12C-30C will have lighting and electrical LED upgrades, and RDR
signage replaced. Additionally, Runway 12C-30C and portions of adjacent Taxiways G, K, and P (north and south of Runway 12C-30C as show on the plans) will have existing runway and taxiway
markings repainted. |
2024-012-IFB | Taxiway W Rehabilitation | 05/02/2024 04:50 PM AZ Time | 05/29/2024 02:00 PM AZ Time | | Solicitation Summary
The intent of the Taxiway W Rehabilitation project is to address the existing pavement distresses and
failing pavement areas that were identified as part of previous inspections. To mitigate the existing
issues identified, it has been determined that portions of the existing Taxiway W pavements (a section
at the south end of the taxiway, and a smaller section located near the Taxiway V intersection) will
require full PCC panel replacements, and localized spall/patch/crack distresses will also be
rehabilitated per the appropriate methodology, throughout Taxiway W, as shown in the Project Plans and details. |